

Basement, Fergus
Fergus · Saturday, July 18
Rigid-core plank over a below-grade slab, chosen so a future leak means lifting a few boards rather than replacing a floor.
Floors we have fitted around Fergus and Centre Wellington. Drag the slider on any of them to see the room before we started.


Fergus · Saturday, July 18
Rigid-core plank over a below-grade slab, chosen so a future leak means lifting a few boards rather than replacing a floor.


Centre Wellington · Saturday, June 27
Fourteen treads capped to match the new main-floor hardwood, with the railing refinished to suit.


Elora · Tuesday, June 2
Engineered oak over a heated slab, with the old carpet and underlay taken away the same day.


Fergus · Thursday, May 14
Waterproof plank throughout the kitchen and eating area, laid in a single run so there is no threshold across the doorway.